Commercial Industrial Best Seller Aseptic 3 Gallon Alkaline Mineral Water Processing Machine for Fully Automatic High Technological Filling Machine

Model NO.
QGF series
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Gravity
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Barrel
Packaging Material
Plastic
Automatic
High
Machine
Barreled Water Filling Machine
PLC
Mitsubishi
Control
PLC
Power
by Order
Transport Package
International Standard Export Package
Specification
SGS, CE
Trademark
BEYOND
Origin
Zhangjiagang, Jiangsu, China
HS Code
8422309010
Production Capacity
200sets/Year
Reference Price
$ 9,000.00 - 27,000.00

Product Description

Commercial Industrial Best Seller Aseptic 3 Gallon Alkaline Mineral Water Processing Machine For Fully Automatic High Technological Filling Machine


Characteristics:
(1)The machine combines auto washing bottle, filling water, placing cap, pressing cap and products outputting as one unit
(2)The PLC(Programmable Logical Controller) controlling systems, which with Panasonic brand and the Air TAC brand pneumatic elements making the machine working more functionally
(3)The international famous brand electric appliances such as LG, OMRON, making the machine working more safely
(4)The main body of the machine made of stainless steel which is sanitary galss and healthy, with impact construction
(5)The rotary spraying washing system can wash bottles more perectly
(6)Inchmeal filling syetem, adjustable filling time, no water spatter when flushing the bottle



Filling:
The cleaned bottles would be turned over with the running of chain, then falls into the a bottle carrying chair, another chair pushing cylinder pushes the chair go ahead with the cleaned bottle to under the filling heads the filling time and the filling vulume can be adjusted by on the operation panel
Fixing and pressing cap:
After the filling steps, the fullfilled bottles will be pushed by the following bottles to the cap trough, all the caps would be supplied by the cap ordering monitor after being laid the caps, the following bottles pushing these tow bottles to the cap pressing cylinder the cap will be pressed firmly by the cylinder Afther all of these step the products will go to the conveyor then to the packing parts
Production line:
The full production line include cap remover, outer and inner automatic bottle washer, upload system, Washing, filling and capping machine, lamp checking, heat shrinking machine, bottle lift machine
Inner and outer washing:
1. This machine is two rows 4 washing sections
2.1st is washing internal bottles with alkali water
3.2ND is washing internal bottles with recycled clear water
4.3rd is washing internal bottles with hot detergent water
5.4th is washing internal bottles with pure water
Model QGF-150 QGF-250 QGF-450   QGF-600 QGF-900 QGF-1200
Filling Heads 1 2 3 4 6 8
Volume(L) 18.9
Barrel Size(mm) φ 270× 490
 
capacity(b/h) 120-150 240-300 400-450 500-600 700-800 1000-1200
  Gas Pressure(Mpa) 0.4-0.6
0.4-0.6
0.4-0.6 0.6 0.6 0.6
Gas Consumption(m 3 /min) 0.37
0.6
0.8 1 1.2 1.5
Moto Power(kw) 1.38 1.75 3.8 7.5 9 13.5
Rated Voltage(V) 380V/50Hz
Weight(kg) 680 1200 1600 2000 3500 4500
 

Service Term
1.  Installation
The initial installation is not included  with the professional  member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our  professional  member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days    . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our  professional  member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2.  Translator
If translator is required and can ' t be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above.  A ll communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1.  Warranty
All parts are under  two  Year Warranty  with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part ' s manufacturer or our company.
 
2.  Payment
30%  of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70%  of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
Connection:
 



Address: XiGang jinfeng town,
Zhangjiagang city, jiangsu province
 

 

LEGALIS.IT, 2023