Blog

ASP Access Floors worked with Cockram Constructions to provide an efficient, environment-friendly raised access floor system within a modern learning environment at the Box Hill Institute, Victoria.

Completed in September 2013, the 2,500m² access floor installation used ASP’s steel cementitious ultra fix system with a 3.0Kn loading at 115mm FFH, and steel cementitious HPL rigid grid system with a 4.5kN loading at 550mm FFH. Calcium Sulphate Raised Access Floor (HDW)

Raised floor system installed at Box Hill Institute | Architecture & Design

Discover products that suit your style and create a list of the items you like or want most.

Search through our latest projects and articles to find your inspiration for your next project

Raised floor system installed at Box Hill Institute | Architecture & Design

Antistatic Raised Floor Join the community and give your insight into projects and news